Positive results improve the resource interpretation to support an updated Mineral Resource Estimate at The Australian Vanadium Project
Key Points:
- New drilling results confirm the consistency and high-grade of the massive magnetite horizons at The Australian Vanadium Project south of Meekatharra, Western Australia
- 1,224 metres of Reverse Circulation (RC) drilling completed at the Australian Vanadium Project in October 2019
- Assay results from the thirteen holes have been received
- Best intersections include:
- 20m at 1.04% V2O5 from 125m in Hole 19RRC012
- Including 4m at 1.29% V2O5 from 136m
- 17m at 1.23% V2O5 from 38m in Hole 19RRC002
- Including 8m at 1.30% V2O5 from 62m
- 12m at 1.21% V2O5 from 22m in Hole 19RRC003
- Including 8m at 1.28% V2O5 from 24m
- 17m at 1.14% V2O5 from 58m in Hole 19RRC004
- Including 5m at 1.29% V2O5 from 62m
- 20m at 1.04% V2O5 from 125m in Hole 19RRC012
- Mineral Resource update underway to incorporate latest RC drill results and diamond drill results from 2019
- Further drill programmes in advanced planning stage. Targeting southern blocks to convert current Inferred Resources to Indicated Resources
High Grade Results from Resource Definition Drilling
View PDF (2MB)