Activity stepping up at Gabanintha

Gabanintha Vanadium Project Update

Flora and vegetation field study part one completed

Subterranean fauna study desktop analysis completed and initial field sampling underway

Water level and quality sampling conducted to assist with hydrology study parameters

New metallurgical test work underway;

  • Focus on improving magnetic concentrate recovery
  • Previous work identified concentrate grades up to 1.54% V2O5 with 80% mass yield from Gabanintha high grade horizon
  • Concentration of Cobalt in non-magnetics offers by-product opportunity – preliminary leach test program underway

Updated resource modelling in progress, including cobalt resource estimate and revision of density and oxidation parameters.

Near surface, transported high V, low Ti horizon being evaluated as part of further drilling and resource expansion, test work.

Gabanintha Update View PDF (2MB)
Scroll to Top